Common Parts Power Interruptions 24/06

On Monday 24th June SSE are due to attend to replace the meters to the Landlords electrical supplies. There are 4 of these, one for each block, and they will be replaced in turn. Each will take, we are told, about 40 minutes.

This means the power to each blocks common parts will be interrupted, affecting at various times the lifts, car park gates, common parts lighting, the entryphone system and the fire alarm system (it will start bleeping). Unfortunately we can’t be specific about what. time each block will be affected, but assuming that they actually turn up the work is due to start at 08:00.

The power to individual flats will not be affected.