St. George’s liaison meeting

St George’s liaison meeting

On Friday the 31st of October George Cross (Director RPFL), Mo Bowyer (RP resident), and Sean Chappell (St. George’s Snr. Construction Manager) held one of their regular liaison meetings – the aim of which is for Regatta Point to raise any issues with the development next door and for St George’s to keep us abreast with progress.

The following are highlights of the meeting:

  • St George’s to liaise with RP contractors to carry out the Helifix work that will strengthen the East wall of RP. This is scheduled to take place in February 2015 and is acknowledged to be very noisy work whilst the drilling takes place.
  • The side gate will continue to be out of use for the boat owners until March 2015.
  • G is to check the exact proposed location of the gates that are to be installed at either end of the alley that runs alongside the RP garden wall, as there are concerns that they are not in the optimum situations.
  • Work on constructing the floors that form the building that will abutt RP will start in approximately 4 weeks once the car park floor is complete.
  • The garden wall next to RP has moved slightly and St G will now underpin it.
  • There has been an upturn in interest in occupying the commercial units though nothing definite.
  • St G reconfirmed their working hours as being 08:00 to 18:00 Monday to Friday and 08:00 to 13:00 on Saturdays. No Sunday working.

   Next meeting Friday 12th December.