OUTSTANDING ACTIONS
LOBBY POWER:
Need to strip out debris and repair. This will re-connect caretaker’s office, lobby, gym, stairwell C to power supply.
The contractors have now cleaned and painted the riser cupboard and installed a new door and access door on first floor lobby (see photos below). They intended to start on the consumer unit installation today subject to the paint drying. We await an update how long the wiring replacement will take and when we can progress with the other repairs.
FIRE BRIGADE REPORT (no change):
Inspections completed and awaiting report – no planned date as yet.
GENERAL CLEANING:
The insurance cleaners will be in attendance as of friday to deodarise the common parts, clean the carpets at ground floor and first floor levels, and carry out a thorough clean of core c, entrance hall and gym. They estimate they will be on site till monday and will be working through the weekend. They will return to carry out cleaning of Neil’s office and the area outside once the repairs in the riser and office are complete.
CAR PARK DAMAGE (no change):
Caused by the need to get at power cables – SSE have relaid cables and contractors filled in hole. New tarmac required – expected to be completed by Thursday the 29th of January.
SECURITY (no change):
Front door lock out of action overnight security guards in place but obsolete fittings may require new unit to be fitted – no planned date as yet.
You may be challenged as to who you are by overnight security.
ENTRYPHONE (no change):
HML await quotes for the temporary and full reinstatement of the system although these are both reliant on an electrical supply. It will be reconnected as soon as possible – no planned date as yet.
BLOCK C TELEPHONE LINES:
BT – Have carried out a further inspection to confirm the works required and we await confirmation when this will be.
BLOCK C VIRGIN MEDIA CABLE (no change):
Have been informed but no site visit as yet – no planned date as yet.
In the meantime – don’t forget that modern flat-screen TVs can be attached to the standard TV aerial socket and tuned in to Freeview.
BLOCK C LIFT (no change):
Needs full inspection after power re-supply – as soon as HML have a reconnection day for the communal electrics they will ask Arrow Lifts to attend. No planned date as yet.
COMPLETED ACTIONS
INSURANCE:
Loss adjust has completed visit and all costs/actions are being agreed with insurer as we progress works.